Capstone Copper Files Technical Report for Mantoverde Optimized Project

VANCOUVER, British Columbia -- Capstone Copper Corp. (“Capstone” or the “Company”) (TSX:CS) (ASX:CSC) has today filed on SEDAR+ a National Instrument 43-101 (“NI 43-101”) compliant technical report (the “Report”) titled “Mantoverde Mine, NI 43-101 Technical Report and Feasibility Study, Atacama Region, Chile” for its Mantoverde Optimized brownfield expansion project announced on October 1, 2024. The Report was prepared by Capstone with assistance from Ausenco Engineering Canada ULC, and was reviewed and approved by Peter Amelunxen, P.Eng., a “qualified person” for the purposes of NI 43-101. The effective date of the Report is July 1, 2024. Read More

Ads Links by Easy Branches
Play online games for free at games.easybranches.com

Guest Post Services www.easybranches.com/contribute