Probe Gold intersects 23.1 g/t Au over 3.1 metres in infill drilling at the Monique deposit, Novador Project, Quebec
All the new analytical results reported in this release and in this table, are presented in core length and cut to 100 g/t Au when needed. True width is estimated between 65 to 95 % of core length. Only grade times thickness above 10.0 g/t Au * m is reported. Read More
Ads Links by Easy Branches
Play online games for free at games.easybranches.com
Guest Post Services www.easybranches.com/contribute
Play online games for free at games.easybranches.com
Guest Post Services www.easybranches.com/contribute